marketing graphic showing a clean, white-background technical diagram. On the left, a single “one master dataset” cross-functional flowchart appears as a structured, Excel-like table with connected process shapes. From it, three blue arrows fan out to the right into three separate panels representing different process lenses: a RACI view with responsibility lanes, a risk and control view highlighting higher-risk steps, and an automation view grouping steps by manual to automated. The design uses blue, teal, amber, and green accents to contrast before and after clarity, and includes a small metallic blue “No Redraw” badge to emphasize that multiple views come from the same underlying dataset without duplicating diagrams.

Visio process lenses: RACI, value stream, risk & automation (no redraw)

A single process map can support many different conversations — but only if it stays consistent. When teams maintain separate Visio files (RACI version, value stream version, risk version), they drift.

The dataset-driven approach is simpler: convert the diagram into a Data Visualizer dataset, keep that dataset as the source of truth, and generate multiple “lenses” as views — without redrawing.

Start with Lite (Free) See Standard (Unlimited)


What is a “lens”?

A lens is an alternate view of the same underlying process. You keep the flow (IDs + connections) constant, then add extra columns for analysis, ownership, and prioritization.

Key idea: keep one dataset as the truth. Build views from it. Don’t maintain multiple drifting Visio files.


Example lenses teams use

Lens What you add to the dataset What you can do with it
RACI Responsible, Accountable, Consulted, Informed Clarify ownership; reduce “everyone owns it” ambiguity; speed approvals.
Value stream Value-added vs non-value-added, wait time, cycle time Identify bottlenecks and delays; target high-impact improvements.
Risk & controls Risk level, control type, evidence required Support compliance audits; reduce control gaps; standardize documentation.
Automation System/tool, automation candidate, manual effort estimate Find quick wins; prioritize automation; reduce rework.

How to build lenses without redrawing

  1. Convert the diagram into a dataset (diagram → dataset) and clean up IDs + connections.
  2. Add lens columns in Excel (RACI, cycle time, risk, automation tags, etc.).
  3. Generate a “lens” view by filtering/highlighting in Excel and regenerating a diagram from the dataset.
  4. Repeat for other lenses — without copying the entire Visio file.

If you want to audit the process first, start here: Audit in Excel.


FAQ

Do lenses require different diagrams?

You can generate different diagrams if you want, but the main win is maintaining one dataset and producing different views from it — even if those views live as Excel filters or multiple exported diagrams.

Will this change the meaning of my original diagram?

No. The flow stays the same. Lenses add columns that make analysis and ownership explicit.

How does AI fit in?

AI works better on datasets than drawings. Once you have lens columns, AI can highlight inconsistencies, missing owners, and improvement opportunities. See: AI analysis.

Back to hub